Mud Soil Pressure Type

SAFE AND SPEEDY EXECUTION OF OPERATION

STEP BY STEP OPERATION

PRELIMINARY UNDERGROUND CONSTRUCTION

1.Install the Pressure Maintaining Wall and the Shaft.
2.Install the Starting Board and prepare the Facility.
3.InstalltheMeasurement Indicator Unit.

PRELIMINARY UNDERGROUND CONSTRUCTION image1
PRELIMINARY UNDERGROUND CONSTRUCTION image2

CUTTING AN OPENING

1.Put the Machine into place.
2.Cut an opening(Launch Point)
3.Insert the Machine.
4.Departure…Tighten Adjustment

CUTTING AN OPENING image1
CUTTING AN OPENING image2

DRIVING OPERATION

1.Inject slurry into the driving face.
2.Commence Driving.
3.Put the Hume Pipe into place.
4.Cut an opening(Arrival)

DRIVING OPERATION image1
DRIVING OPERATION image2
DRIVING OPERATION image3
DRIVING OPERATION image4

REMOVAL PROCESS

1.Remove the Machine.
2.Drive the Hume Pipe to the predetermined position.
3.Remove the insides of the pipe.
4.Effect Pipe Jointing
5.Dismantle facility.

REMOVAL PROCESS image1
REMOVAL PROCESS image2